Sudhausbau 5 HL Brewhouse
EUROPE (Western and Northern)
Components
Grist mill
1 piece grist mill
2 foot stands with rubber bumpers
1 additional larger hopper
Throughput up to 200 Kg/h
Brewhouse in stainless steel
Cast wort/ brew
2 units steam heated
Control system with automatic mashing
Switch and control cabinet
Completely wired and ready for connection
Control cabinet assembly with:
1 x control via touch screen Siemens 9"
1 x contactor circuit 0,37 KW agitator
1 x contactor circuit 0,37 KW chipper
1 x contactor circuit 230V/16A steam valve
2 x 24VDC outlet temperature sensor
2 x temperature measurement
Analog input 4-20
Hardware and software
The control unit with automatic mashing is designed for the connection of the agitator, chopper and
2 temperature sensors
Wort boiling also runs automatically via the control system
The pump and the agitator are frequency controlled
Steam generator
1 piece electr. steam generator
Operating pressure: max. 5 BAR
heating capacity: 45 kW / h
Voltage: 400 V / 3 / 50hz / PE
Steam output: approx. 60 kg / h
Water treatment for steam generator
1 piece water treatment and softening
Fermentation cellar
2 pieces open fermentation vats 10 hl (year of construction 2015)
Round design, with cooling stand on standard feet
The vats are equipped with lid and spray ball for cleaning
Net capacity: 10,0 hl
Capacity gross: 13,0 hl
Cooling
1 cooling zones on the jacket each 1.6 m2
Equipment
Temperature sensor for cooling control
Tap for sampling
Inlet/outlet DN25 with disc valve
Storage cellar
3 pcs. storage tank 10 hl (horizontal, without cooling and insulation)
Content net: 10,0 hl
Capacity gross: 11,0 hl
2 pcs. storage tank 5 hl (lying, without cooling and insulation)
Content net: 5,0 hl
Capacity gross: 6,0 hl
Water treatment
1 hot water tank
Volume 700 l, unpressurized
Insulation 70 mm by mineral wool and covered with stainless steel
1 screw-in heater to keep the water at temperature
1 cold water tank
Volume 700 l, unpressurized
Insulation 70 mm by mineral wool and clad with stainless steel
The cold water tank is cooled by the offered refrigeration unit
Refrigeration control
1 piece cooling unit
3 pieces single tank control / temperature controller
Ready-made control unit for
Tank and direct connection with the cooling circuit
With solenoid valve, strainer and thermal sensor ready for immediate use
Connection 1⁄2"
Centrifugal pump
1 mobile single-stage centrifugal pump on mobile frame WITHOUT hood
2 pieces of beer hose in DN 25
Semi-automatic KEG cleaning system
1 piece semi-automatic KEG-cleaning unit
Type: BabyKEG
Capacity: 20 KEG/h
SPS and control panel
Co2 valve for preloading
KEG residual pressure test
Insulated detergent tank with electric heater