Menu

Macchi, Siemens, Tosi Boiler and Generator plant Main: 25T/ hr - Secondary: 16t/ hr

Ref : 2598794-8-CP
Condition : Used
Manufacturer : Macchi, Siemens, Tosi
Model : Boiler and Generator plant
Capacity : Main: 25T/ hr - Secondary: 16t/ hr
Year(s) : 2003
Quantity : 1
Location : Seller or machines location:
EUROPE (Western and Northern)

1/ Main boiler
Manufacturer: SICES
Year of start up: 2003
Max production capacity: 25 ton/h (overheated steam)
Steam pressure at grip valve: 55 bar
Seal pressure: 62 bar g
Overheated steam temperature: 430 C°
Thermal output with 20 t/h production: 92,5%
Output test trial according to UNI 7708 rules
Fuels:
– liquid: fuel oil (present configuration)
– gas: natural gas
– solid: wooden dust

Status : stopped in 2018 , then anti-corrosion treatment carried out

2/ Secondary boiler
Manufacturer: MACCHI
Year of made: 1973
Production capacity: 16 T/h (saturated steam)

Turbo alternator group
Turbine made by Tosi
Overhauled and upgraded in 2003
Max production capacity: 2200 Kw and 25 tons of steam overheated at 55 bar, 430 C°, discharging pressure 4,5 ata
Alternator made by Siemens
Overhauled in 2003

Other machines similar to Macchi, Siemens, Tosi Boiler and Generator plant Main: 25T/ hr - Secondary: 16t/ hr

7
Location : EUROPE (Western and Northern)
Year(s) : 2010
2
Location : EUROPE (Western and Northern)
Year(s) : 1983
3
Location : EUROPE (Central and Eastern)
1
Location : AMERICA North (USA-Canada-Mexico)