JBT, Meypack, Waldner Tray filling line with final packaging
EUROPE (Western and Northern)
ZELLWEG / CH, built in 2011
8-lane plastic tray feeder (horizontal from 1st floor)
WALDNER bottling line
type Dosomat 20.8, year of construction 2011
8-lane filling line, cup pockets for 3 formats
2 x pocket, 1 x piston filler,
Foil seal u. Punching station
(gassing possible)
current format: round cup m
"Bear ears", power max. 240 cups / min
possible formats: oval cup 80gr
130gr, 200gr, power max. 280 cups / min
JBT / B, year of construction 2011
Picking the plastic cups
including Kuka robot in sterilization cages
Transport and packing system m. 6 kuka robots
SolvAir, year of construction 2011
Drying the plastic cups
LUCEO / F, type Thermo Secure L100
year of construction 2013
Sealing seam inspection by means
of camera system (detects sealing errors
wrinkles, irregularities, external product etc.)
Del Packaging / US, year of construction 2011
Capper, performance currently 150 cups / min
Pick and place facility on the 1st floor
MEYPACK, year of construction 2011