Complete Effluent Water Treatment Plant, 180-200 m3/ hr
EUROPE (Western and Northern)
Complete Effluent Water Treatment Plant, 180-200 m3/ hrplant, built in 1999, was working in a big paper mill
1999 year of make
Water treatment capacity: 180 - 200 m3/h
Chemicals storage tanks
Anaerobic reactor with biogas production, 1500 m3, built of mild steel, insulated, with steam pre-heater and chemicals mixing tank. Working temperature 30 - 35 C°, Ø 15,6 m, H 8 m
Biogas collecting tank
2 parallel oxigenation concrete tanks, each with enough capacity to run the plant
3 Robuschi ventilation fans, 1 for each tank + 1 spare for both
2 sludge sedimentation tanks: sludge was recicled in the oxigenation tanks; the excess back to the pulper
All drawings and technical documentation available
Technical details of water quality:
COD inlet: 900 - 1200 mg COD/lt
COD oulet: 50 - 60 mg COD/lt
Limit of law (Italy)